Leopold Quartier, Vienna

Customer
Porr Bau GmbH
Installed products
Hybrid-Flatslab

Specifics

  • the shell upwards the first floor is made of prefabricated parts
  • no substructure, so the subsequent finishing trades can start very early
  • delivery and complete assembly by one contractor (OBERNDORFER)
  • continuous utilization of all 4 rotary tower cranes due to overhead assembly cycles
  • minimal concreting on site (no soiling of the visible timber components)
  • shorter shell construction and overall construction time