Leopold Quartier, Vienna
Customer
Porr Bau GmbHInstalled products
Hybrid-Flatslab
Specifics
- the shell upwards the first floor is made of prefabricated parts
- no substructure, so the subsequent finishing trades can start very early
- delivery and complete assembly by one contractor (OBERNDORFER)
- continuous utilization of all 4 rotary tower cranes due to overhead assembly cycles
- minimal concreting on site (no soiling of the visible timber components)
- shorter shell construction and overall construction time